E-Mu SP1200 Spezifikationen Seite 218

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 288
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 217
PROPRIETARY DATA: This document contains proprietary data of ABB Inc. No disclosure, distribution (electronic or otherwise),
or other means of dissemination may be made without written permission.
3BUS 208 000 R1301196 Replacement Procedures
Idler Pulley
Use these procedures to replace the idler pulley. Refer to Figure 10-4.
1. Turn off the power to the drive motor.
2. Loosen the idler tension adjustment locks and theidler pulley.
3. Remove the bolt that secures the pulley and lift the pulley off the shaft.
4. Replace the pulley assembly.
5. Adjust the idler tension adjustment bolts.
6. Perform the “Process Direction Alignment” on page 48.
Figure 10-4 Idler Pulley
Exercise care when working with toothed belt and
toothed gear equipment. Do not wear ties or loose
clothing while working near equipment.
Pulley Tension
Adjustments
Pulley Tension
Adjustment Locks
Drive Belt
Drive Pulley
Pulley Shaft
Top View
Side View
Seitenansicht 217
1 2 ... 213 214 215 216 217 218 219 220 221 222 223 ... 287 288

Kommentare zu diesen Handbüchern

Keine Kommentare