PROPRIETARY DATA: This document contains proprietary data of ABB Inc. No disclosure, distribution (electronic or otherwise),
or other means of dissemination may be made without written permission.
3BUS 208 000 R130146 Hardware Installation
7. Thread two parallel lengths of wire over the rolls onto which the process is
being guided. See Figure 3-12.
These wires should be placed in the positions that are representative of the
outside edges of the process sheet.
8. Suspend a weight of approximately 5 lb. (3 kg) from each end of the wire.
Figure 3-12 Simulating the Process Pass Line
9. Rotate the lower head to the desired pass angle.
10. Tighten the four locking M8 bolts (lower adapter plate mounting bolts) on each
side of the bottom carriage. See Figure 3-11 on page 45.
11. Remove the top cover of the upper head. .
12. Loosen upper adapter plate mounting bolts and remove the mounting bolts with
eccentrics. See Figure 3-13 on page 47.
13. Loosen the adapter plate extension mounting bolts. See Figure 3-13.
14. Adjust the four vertical adjustment screws so that the weight of the upper
carriage rests on the bolts of the upper adapter plate.
This is done so that when you adjust the air gap between the upper and lower
sensor heads you have enough slack to move the upper head vertically.
15. Rotate the upper head package to approximate pass angle and move the upper
head package directly over the lower head package.
16. Rotate the upper head package to match the lower head package angle closely
by visual inspection.
17. Tighten the upper adapter plate extension mounting bolts. See Figure 3-13.
Stretched wire
representing sheet
edge
Customers Roll
Weight