PROPRIETARY DATA: This document contains proprietary data of ABB Inc. No disclosure, distribution (electronic or otherwise),
or other means of dissemination may be made without written permission.
3BUS 208 000 R1301 209Replacement Procedures
Motor Drive Replacement (ABB ACS-100)
Complete the following procedure to replace the Motor Drive. The FINCOR and
Lovejoy Motor Controllers are not available and must be replaced by the ABB ACS-
100 Drive. See Figure 10-14.
The ABB Motor Controller upgrade kits include specific instructions on the
replacement procedures. If the SP1200 frame has the motor controller mounted in
the Drive End Column, then the upgrade kit is 134137-003. If the motor controller
is located in the Remote Junction Box, then the upgrade kit is 134137-001
1. Turn Off power to the Motor Drive sled.
2. Pull out the Motor Drive sled.
3. Disconnect the three cables from the Motor Drive sled.
4. Remove the old motor drive sled and replace with the new one.
5. Reconnect the cables to the Motor Drive sled.
6. Return Motor Drive sled to its position in the drive end column.
7. Turn On power to the controller and complete the Motor Controller Setup
procedure. See “Motor Drive Setup (ABB ACS-100)” on page 70.
Note: If the motor happens to run backwards, swap the wires in JDRV-1
and JDRV-3.
8. Execute the standard frame tuning procedure (ft) in the software.
Figure 10-14 SP Motor Drive Assembly
Exercise care when working with toothed belt and
toothed gear equipment. Do not wear ties or loose
clothing while working near equipment.
Motor Drive